buller_logo wcrc_logo

The Mokihinui Hydro Proposal

 

Further Information

This page will contain all additional information supporting the consent Application

Click one of the below names to jump to the relevant table:

Section 92 RFI No. 1   |   Section 92 RFI No. 2   |   Post Notification Reports

 

Section 92 Request For Information Number 1

Document / Section File File size
Council Section 92 Request For Information Number 1 Council Section 92 RFI No. 1.pdf 1.1 MB
   
Meridian Response to Council Request For Information Number 1 Meridian Response to RFI No. 1.pdf 709 KB
Attachment A Waewae Mokihinui Meridian Energy CIA 160608 _2_.pdf 511 KB
Attachment B 1.14 - Lakeshore effects Photos.pdf 1.4 MB
Attachment B Captions for oblique aerial photos in Mokihinui Gorge.pdf 16 KB
Attachment C s92 1.14_Att A.pdf 7.6 MB
Attachment D 2.9 - Revised fig 2_stormwater.pdf 6.8 MB
Attachment E Sketch drawings.pdf 191 KB
Attachment F 5.2 Dam Performance.pdf 197 KB
Attachment G 5.4 Preliminary Stability Assessemnt - 17 June 2008.pdf 2.3 MB
Attachment H Location of Wells.jpg 385 KB
Attachment I Attachment I.pdf 58 KB
Attachment J Existing Road Property Boundaries.pdf 514 KB
Proposed Road llignment.pdf 1.7 MB
Proposed Alignment Design Vehicle Swept Path.pdf 164 KB
Typical Cross Section.pdf 125 KB
Attachment K BDC 3.15 - appendix A.pdf 55 KB
Attachment L BDC 3.19 - appendix B.pdf 4.4 MB
BDC 3.19 - appendix B_2.pdf 398 KB
Attachment M BDC 14 - appendix D.pdf 1.1 MB
Attachment N bdc 16 signs.jpg 2.5 MB
Info Panels.pdf 325 KB

 

Section 92 Request For Information Number 2

Document / Section File File size
Council Section 92 Request For Information Number 2 Council Section 92 RFI No.2.pdf 871 KB
   
Meridian Response to Council Request For Information Number 2 Meridian response to RFI No.2.pdf 218 KB
Attachment A Attachment A_track photos.pdf 228 KB
Attachment B Attachment B_ASR Peer Review.doc 146 KB
Attachment B Attachment B_Meridian response to peer review.doc 146 KB
Attachment C Attachment C_Revised Failure Modes and Consequences Report.pdf 15 MB

 

Further Reports Received Post Notification

File File-size
Draft SIA 9 Mar 08.pdf 4 MB
Effects of Landslides on Dam and Reservoir - Opus.pdf 1.7 MB
Initial assessment of Active Faulting - GNS.pdf 5.3 MB
Pre-feasibility information relating to MHP - GNS.pdf 1.2 MB
Terrestrial Ecology Baseline Report (with figures and appendices).pdf 64 MB
Terrestrial Ecology Assessment for Concession Application 2 April 2008.pdf 4.8 MB
Revised Aquatic Ecology MP.pdf 583 KB